This guide is for ITI electricians and fitters in India preparing for jobs in factories, construction sites, building maintenance and apprenticeships, and for experienced technicians moving up to maintenance supervisor. It also helps with PSU and railway technician interviews, whose process each official notification sets. It has 60 questions with model answers in three levels: ITI basics, tools and safety; the faults, motors, calculations and maintenance work of the first few years; and senior topics such as breakdown analysis, maintenance plans, PLC and drive faults, safety permits and leading a crew. About two thirds are electrical and one third fitting and mechanical maintenance. Every calculation has been worked out, and the safety and licence rules follow the Central Electricity Authority's safety regulations; check the current text before relying on them.
- 60 questions, 3 levels
- Updated
- CoreHRx Jobs
- 31 open Electrician and ITI Fitter jobs
What electrician and fitter interviews cover
- Electrical basics asked as quick sums: Ohm's law, power and units, three-phase voltages, power factor, motor speed and full-load current.
- Wiring, earthing, protection and testing: staircase wiring, earth pits, MCB curves, RCCBs, meggers and clamp meters, often with a drawing to make or a fault to find.
- Safety and rules: PPE, lockout-tagout, permits to work, and what the CEA's safety regulations say about licensed work, earthing and RCDs.
- For fitters: marking, filing, drilling and tapping, vernier and micrometer reading, limits and fits, bearings, alignment, hydraulics and pneumatics.
- For experienced roles: breakdown analysis, preventive maintenance plans, MTBF and MTTR, PLC and drive faults, and leading a shift crew.
How freshers should prepare
- Revise your ITI trade theory and work the sums in this guide on paper, saying each formula and unit aloud.
- Practise drawing the DOL, star-delta and forward-reverse control circuits and staircase wiring until you can do them without notes.
- Carry your certificate, mark sheets and any apprenticeship or training record, and be ready to describe the jobs you made in the ITI workshop.
- Many interviews include a practical such as reading a vernier, a small wiring job or a meter test. Handle the tools carefully and follow safe steps while the interviewer watches.
How experienced candidates should prepare
- Prepare three or four breakdown stories: the machine, the fault, how you found it, the time taken and what you changed so it did not return.
- Know the equipment you have maintained by rating and make, such as motors, drives, PLCs, transformers, compressors or hydraulic presses.
- Be ready to explain your plant's permit-to-work and lockout system, and the records you kept for earth, insulation and PM checks.
- For supervisor roles, bring your numbers: breakdowns per month, MTTR, PM completion and the spares you planned.
Certificates, licences and trade tests
- ITI electrician and fitter courses lead to the National Trade Certificate under the Directorate General of Training (NCVT) or a state SCVT certificate. Check which one a job notification asks for.
- An apprenticeship under the Apprentices Act, 1961 ends with the National Apprenticeship Certificate after the trade test, and interviewers often ask what you did during it.
- Electrical installation work needs a state permit or certificate of competency, often called a wireman or supervisor licence. Names, eligibility and exams differ by state, so check your state's licensing authority.
- Railway, PSU and government technician posts usually have their own written and trade tests. The official notification gives the eligibility, syllabus and process for each recruitment.
- Safety rules now come from the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023, which replaced the 2010 regulations. Older books still quote the Indian Electricity Rules, 1956, whose rule numbers differ, so name the current regulations.
Common mistakes to avoid
- Saying you would work on a live panel to save time. Interviewers want to hear isolate, lock, tag and test before touch.
- Raising an overload setting, fitting a bigger fuse or bypassing an RCCB to stop trips, instead of finding why the current is high or leaking.
- Dropping units and conversions, such as HP to kW, bar to N per sq mm, or the return conductor in a voltage drop sum.
- Quoting rules or limits from memory. Name the source, such as the CEA's safety regulations or the maker's manual, and say you would check the current text.
Electrician and ITI Fitter interview questions: Easy questions (freshers)
20 questions1. State Ohm's law. A 2,000 W room heater runs on 230 V. What current does it draw, and what is its resistance?
Ohm's law says the current through a conductor is proportional to the voltage across it at a constant temperature, so V = I x R. Power is P = V x I. The heater draws 2,000 / 230 = about 8.7 A, and its resistance is V squared divided by P: 52,900 / 2,000 = about 26.5 ohm. At 8.7 A it needs a 16 A power socket and wire sized for it, not a 6 A light point. Interviewers ask this to see whether you can move between V, I, R and P quickly, and whether you connect the answer to the socket and wire you would choose.
2. What is one unit of electricity? A 1.5 kW geyser runs 2 hours a day. How many units does it use in 30 days, and what does that cost at Rs 8 per unit?
One unit is one kilowatt-hour: 1,000 watts used for one hour, which is what the energy meter counts. The geyser uses 1.5 kW x 2 hours = 3 units a day, so 3 x 30 = 90 units in 30 days. At Rs 8 per unit that is 90 x 8 = Rs 720, before fixed charges and taxes, which depend on the state tariff. The common mistake is to confuse kW, the rate at which power is used, with kWh, the energy used over time. Explaining a bill this simply also helps in building maintenance jobs, where residents often ask why their bill went up.
3. What is the difference between single-phase and three-phase supply, and why do factories use three-phase?
Single-phase has one live conductor and a neutral, at 230 V in India, and suits homes, lights and small appliances. Three-phase has three live conductors whose voltages are 120 degrees apart, plus a neutral. Each phase is 230 V to neutral, and the voltage between any two phases is root 3 times that, about 400 V; many older nameplates and drawings say 415 V. Factories use three-phase because it carries more power on smaller conductors, and three-phase motors start on their own and run smoothly. Interviewers check that you know both voltages and would not call a phase-to-phase reading of 400 V a fault.
4. What is the difference between neutral and earth, and why is earthing necessary?
The neutral is a current-carrying conductor: it completes the circuit back to the transformer, so in normal working it carries the load current. The earth wire normally carries no current. It connects metal bodies, such as a motor frame, a geyser or a panel door, to the earth electrode, so that if a live wire touches the body, fault current flows to earth and the MCB, fuse or RCCB disconnects the supply instead of the body staying live. The neutral must never be used as an earth or joined to it inside a socket. A good answer also says that an earth must be tested, not just present.
5. How do you wire a staircase light so that it can be switched on and off from both the top and the bottom of the stairs?
I use two two-way switches. The phase goes to the common terminal of the first switch. Its two other terminals are joined to the two matching terminals of the second switch by two strapping wires, and the common terminal of the second switch goes to the lamp. The neutral goes straight to the lamp. Whichever switch is flipped, the lamp changes state. The switches must break the phase, not the neutral, so the lamp holder is dead when the light is off. Interviewers often ask candidates to draw this, so practise drawing it neatly with every terminal and wire labelled.
6. Before you work in a distribution panel, what personal protective equipment and tools should you have?
I need rubber gloves of the right voltage class, which I air-test for holes before use, safety shoes, a helmet, and a face shield with safety glasses. Clothing should be arc-rated and flame-resistant, or at least cotton, never synthetic, which melts in an arc. My tools are insulated screwdrivers and pliers, a line tester or voltage detector, and a lock and tag for the isolator. The CEA's safety regulations list rubber gloves, safety footwear, helmets, line testers, voltage detectors and earthing devices among the equipment workers must be given, plus protection against arc flash. Saying I would switch off and isolate the panel first shows the right attitude.
7. A co-worker gets an electric shock and is still holding the wire. What do you do?
First, I do not touch him. I switch off the supply at the nearest switch or MCB, or pull the plug. If I cannot do that quickly, I push the wire or his hand away with something dry and non-conducting, such as a wooden stick or a dry plastic pipe, while standing on a dry surface. Then I shout for help and call the first-aider and an ambulance. If he is not breathing and I am trained, I start CPR until help arrives. The CEA's safety regulations require instructions for treating electric shock to be displayed in factories that use electricity, so know where your site's chart is.
8. How do you measure voltage and current with a multimeter, and what is the most common mistake?
For voltage I set the meter to AC or DC volts on a range above the expected value and connect the probes across, that is in parallel with, the two points, such as phase and neutral at a socket. For current the meter must be in series: I open the circuit, connect the meter into it and move the probe to the amps socket. The classic mistake is to leave the probe in the amps socket and then touch it across a live supply. That is a short circuit through the meter, which blows its fuse or causes an arc. Before panel work I also check that the meter's CAT rating suits the panel.
9. What is a megger, and why can a normal multimeter not replace it for checking insulation?
A megger, or insulation resistance tester, applies a high DC test voltage, for example 500 V for low-voltage wiring, and shows the resistance in megohms between conductors or between a conductor and earth. A multimeter's resistance range uses only a few volts, so insulation that is weak, damp or cracked can still read high and look fine, then break down at working voltage. Before testing I isolate the circuit and disconnect anything electronic, and after testing I discharge the cable. The CEA's safety regulations say a low-voltage line disconnected for an addition, alteration or repair must be tested before it is reconnected.
10. How do you use a clamp meter, and what happens if you clamp the phase and neutral of a circuit together?
A clamp meter measures current without opening the circuit. I select AC amps, open the jaws and close them around one conductor only, keeping it near the centre of the jaws, and read the current. If I clamp the phase and neutral of the same circuit together, their currents flow in opposite directions and cancel, so a healthy circuit reads almost zero. That is still useful: a small reading means some current is leaking to earth, which is how a leakage clamp is used. On a three-phase motor I read each phase in turn and compare the three readings with the nameplate full-load current.
11. Why does a three-phase induction motor need a starter, and how does a DOL starter work?
At switch-on an induction motor draws a starting current several times its full-load current. It also needs protection against overload and a way to stop it safely, and it must not restart by itself after a power failure. A direct-on-line starter connects the motor straight to the full supply voltage through a contactor. Pressing START energises the coil, the main contacts close, and an auxiliary contact holds the coil on. STOP breaks the coil circuit, and the overload relay opens it if the current stays high. DOL suits small motors. Interviewers often ask you to draw the control circuit, so know where the hold-on contact sits.
12. A 4-pole induction motor runs on 50 Hz, and its nameplate says 1,440 rpm. What are its synchronous speed and its slip?
Synchronous speed is 120 x frequency / number of poles, so 120 x 50 / 4 = 1,500 rpm. That is the speed of the rotating magnetic field. The rotor always runs a little slower, otherwise no current would be induced in it and it would produce no torque. Slip is (1,500 - 1,440) / 1,500 = 60 / 1,500 = 0.04, or 4 percent. Slip rises with load, so an overloaded motor runs slower and hotter. A 2-pole motor on 50 Hz has a synchronous speed of 3,000 rpm, which is why many pump motors run at a little under 3,000 rpm. Interviewers want the formula and the reason for slip.
13. What is the difference between a fuse and an MCB?
Both protect a circuit against overload and short circuit. A fuse has a wire or element that melts when too much current flows, and it must be replaced after it operates, with exactly the same rating and type. An MCB is a switch that trips through a thermal element for overloads and a magnetic coil for short circuits, and it can be reset once the fault is cleared. An MCB also works as an isolating switch and cannot be bodged with a thicker wire. HRC fuses are still used in panels because they can interrupt very high fault currents. Replacing a blown fuse with a bigger one is a classic wrong answer.
14. What does an RCCB do that an MCB does not, and what sensitivity is used in homes?
An MCB responds only to overcurrent. An RCCB compares the current going out on the phase with the current coming back on the neutral. If the difference, which is current leaking to earth, perhaps through a person, crosses its rated residual current, it trips. So it protects against shocks and earth-leakage fires that an MCB will not notice. The CEA's safety regulations require a residual current device of not more than 30 mA in domestic installations, and RCCBs are also made in 100 mA and 300 mA ratings for other uses. A plain RCCB gives no overload protection, so it is used with MCBs, or an RCBO combines both.
15. You are given a mild steel block and the drawing of a simple fitting job. In what order do you work?
First I read the drawing for dimensions, tolerances and finish, and check the stock size. Then I file one face flat and a second face square to it, because all marking is done from these reference faces. I apply marking blue or chalk, mark the lines with a scriber, try square, odd leg caliper or vernier height gauge, and punch them lightly. Next comes hacksawing close to the line, filing to size, drilling and tapping if needed, and finally deburring and checking every dimension with a vernier or micrometer. The common mistake is marking from an unfinished face, which throws every later dimension off.
16. How do you choose a hacksaw blade, and how should you fit and use it?
I choose the teeth per inch by the thickness and material: a coarse blade, such as 14 or 18 teeth per inch, for thick soft material, and a fine blade, such as 24 or 32, for thin sheet and tubes. A common workshop rule is that at least three teeth should always be in contact with the work. The blade goes in the frame with the teeth pointing forward, away from the handle, because it cuts on the forward stroke, and it is tensioned firmly. I use the full length of the blade, press only on the forward stroke, keep a steady rhythm and ease off near the end of the cut.
17. A vernier caliper has 50 vernier divisions equal to 49 main scale divisions of 1 mm. What is its least count? Read a measurement where the vernier zero is just past 24 mm and the 17th vernier line coincides.
The least count is one main scale division minus one vernier division. One vernier division is 49 / 50 = 0.98 mm, so the least count is 1 - 0.98 = 0.02 mm. The reading is the main scale value before the vernier zero plus the coinciding vernier line times the least count: 24 + 17 x 0.02 = 24 + 0.34 = 24.34 mm. Before measuring I close the jaws and check for zero error, and correct the reading if there is one. Interviewers often hand you a vernier and a job, so practise reading it quickly and holding the jaws square without pressing hard.
18. A micrometer has a 0.5 mm pitch and 50 thimble divisions. The sleeve shows 12.5 mm, the thimble reads 28, and there is a zero error of +0.02 mm. What are the least count and the correct reading?
Least count is the pitch divided by the number of thimble divisions: 0.5 / 50 = 0.01 mm. The observed reading is the sleeve value plus the thimble divisions times the least count: 12.5 + 28 x 0.01 = 12.78 mm. A positive zero error means the micrometer already shows 0.02 mm when closed, so the error is subtracted: 12.78 - 0.02 = 12.76 mm. I clean the anvil and spindle faces before checking zero, and turn the ratchet so the measuring force is the same every time. Getting the sign of the zero error correction wrong is the usual mistake.
19. What is the difference between first angle and third angle projection, and how do you know which one a drawing uses?
Both show an object in orthographic views, but place them differently. In first angle projection the top view is drawn below the front view, and the view seen from the left is placed on the right of the front view. In third angle projection the top view is above the front view, and the view seen from the right is placed on the right. BIS drawing practice uses first angle, so most Indian drawings follow it, while drawings from some foreign machine makers are third angle. The drawing shows its method with the projection symbol, a small cone in two views in the title block, so check it before reading any view.
20. What is the difference between an NCVT and an SCVT ITI certificate, and what does an apprenticeship add?
An NCVT certificate is the National Trade Certificate issued under the Directorate General of Training after its trade test, for courses such as the two-year Electrician and Fitter trades. An SCVT certificate is issued through the State Council for Vocational Training for courses affiliated with the state. Many employers accept both, but some government and PSU recruitments specify one, so I check the official notification. An apprenticeship under the Apprentices Act, 1961 adds structured training inside a factory and, after the trade test, the National Apprenticeship Certificate. Interviewers value it because the candidate has already worked real shifts under supervision.
Electrician and ITI Fitter interview questions: Medium questions (1-3 years)
20 questions21. A three-phase motor draws 20 A at 400 V with a power factor of 0.8. Calculate its input in kVA and kW, and explain what a low power factor costs a plant.
Apparent power is root 3 x line voltage x line current: 1.732 x 400 x 20 = 13,856 VA, about 13.9 kVA. Real power is that times the power factor: 13.86 x 0.8 = about 11.1 kW. The rest, about 8.3 kVAR, is reactive power that magnetises the motor but does no useful work. A low power factor means more current for the same kW, so cables, transformers and switchgear carry more load and losses rise, and many tariffs penalise it or bill on kVA demand. That is why plants fit capacitor banks, and why I check their contactors and fuses during maintenance.
22. Explain how a star-delta starter works. Why does it reduce the starting current, and what is the trade-off?
The motor starts in star, so each winding gets the line voltage divided by root 3, about 231 V on a 400 V supply, instead of the full 400 V. After a timer delay, once the motor is near full speed, the star contactor opens and the delta contactor closes, giving each winding full line voltage. In star the line current and the starting torque both fall to one third of their direct-on-line values. The trade-off is that low torque, so star-delta suits fans and pumps that start lightly loaded, not loaded conveyors. The motor must be rated to run in delta at the supply voltage, with six terminals brought out.
23. How do you reverse a three-phase motor, and why does a forward-reverse starter need interlocking?
Swapping any two of the three supply phases reverses the rotating field, so the motor runs the other way. A forward-reverse starter has two contactors: one connects L1, L2 and L3 in order, and the other swaps two of them. If both closed together, two phases would be shorted through the contacts, causing a heavy fault and possibly welding them. So the starter has an electrical interlock, a normally closed auxiliary contact of each contactor in the other's coil circuit, and usually a mechanical interlock as well. On a heavy load I stop the motor fully before reversing, to avoid a large current surge and mechanical shock.
24. A motor nameplate says 30 HP. Convert it to kW, estimate the full-load current at 400 V with a power factor of 0.85 and an efficiency of 90 percent, and say how you would set its overload relay.
Taking 1 HP as 746 W, 30 HP is 30 x 746 = 22,380 W, about 22.4 kW of shaft output. Input power is output divided by efficiency: 22,380 / 0.9 = about 24,870 W. Current is input power divided by root 3 x voltage x power factor: 24,867 / (1.732 x 400 x 0.85) = about 42 A. In practice I take the full-load current from the nameplate, since the maker measured it, and set the overload relay at or close to it, not well above it to avoid trips. If it trips, I find out why the motor is drawing more current instead of raising the setting.
25. What is single phasing in a three-phase motor, what causes it, and how is the motor protected?
Single phasing means one of the three supply phases is lost while the other two remain, for example when one fuse blows, a contactor contact burns out or a cable lug comes loose. A stopped motor will not start; it only hums. A running motor keeps running, but it draws much more current in the two healthy phases and overheats quickly, which can burn the winding. Protection is an overload relay with phase-loss sensitivity, a separate phase failure relay, or a motor protection circuit breaker. In maintenance I check that all three fuses are the same rating and tight, and compare the three phase currents with a clamp meter.
26. MCBs come in B, C and D curves. What is the difference, and which would you choose for lighting and for a motor?
The curve letter sets the magnetic, or instantaneous, trip level as a multiple of the rated current. Under IS/IEC 60898-1, a B curve trips instantly between 3 and 5 times the rated current, a C curve between 5 and 10 times, and a D curve between 10 and 20 times; the thermal overload behaviour is the same for all three. B suits resistive loads and lighting, including long cable runs where fault current is low. C suits general circuits and small motors. D is for high inrush loads such as transformers and larger motors. A B curve on a motor usually causes nuisance trips at start-up.
27. What is the difference between pipe earthing and plate earthing, and how do you test and maintain an earth pit?
In pipe earthing a galvanised iron pipe is driven or buried vertically in the ground; in plate earthing a copper or GI plate is buried upright in a pit. Pipe earthing is cheaper and easier to keep moist through a funnel, while plate earthing gives more contact area. Designers follow IS 3043, the BIS code of practice for earthing. I test resistance with an earth tester by the three-electrode fall-of-potential method, with the electrode disconnected from the installation, and compare it with the design value and past readings. Maintenance means keeping the pit moist, cleaning and tightening joints, and recording readings, especially in the dry season.
28. A 230 V single-phase load of 20 A is 30 m from the board, wired in 2.5 sq mm copper. Taking copper's resistivity as 0.0172 ohm sq mm per metre, what is the voltage drop?
Current flows out on the phase and back on the neutral, so the conductor length is 2 x 30 = 60 m. Resistance is resistivity x length / area: 0.0172 x 60 / 2.5 = about 0.41 ohm. The voltage drop is current x resistance: 20 x 0.4128 = about 8.3 V, which is 8.3 / 230 = about 3.6 percent of the supply. I would compare that with the limit in the site specification; if it is too high, 4 sq mm cuts the drop to about 5.2 V. The cable must also carry the current for its installation method. Forgetting the return conductor halves the answer, which is the usual mistake.
29. Walk me through a lockout-tagout on a conveyor motor before you change its bearing.
I inform the operator and the supervisor, then stop the conveyor with its normal stop button. I identify every energy source: the motor feeder, any separate control supply, and stored energy such as a tensioned belt or a load that can move under gravity. I open the isolator, fit my personal lock and a tag with my name, the date and the reason, and release or block the stored energy. Then I verify: I try the local start button, and test for voltage at the motor terminals with a tester I prove on a known live source before and after. Only I remove my lock, once the guards are back and the area is clear.
30. How do you carry out an insulation resistance test on a three-phase motor, and what does the polarisation index tell you?
I isolate and lock off the motor, disconnect its cable at the terminal box, and disconnect anything that could be damaged, such as a drive or surge protector. For a 415 V motor the plant procedure usually sets a 500 V or 1,000 V DC test. I test each winding to earth and, with the links removed, between windings, for one minute each, noting the readings and the winding temperature, since resistance falls as temperature rises and readings are compared at a reference temperature. Then I discharge the winding. The polarisation index is the 10-minute reading divided by the 1-minute reading: about 2 or more is generally taken as good, and near 1 suggests moisture or dirt.
31. A 15 kW pump motor keeps tripping on overload after about 20 minutes of running. How do you find the cause?
First I check the facts: the overload setting against the nameplate full-load current, and whether it really is the overload tripping and not another protection. Then, with the pump running, I measure all three phase currents with a clamp meter and the three line voltages. Equal currents above full load point to the load: a choked impeller, a blocked or wrongly throttled line, or tight bearings. Unequal currents point to supply imbalance, a loose connection or a winding fault, which I confirm with insulation and winding resistance tests. I also check the cooling fan and air path. Raising the relay setting to stop the trips is the wrong answer.
32. The RCCB in a building's distribution board keeps tripping, sometimes at night. How do you trace the fault?
First I check whether it still trips with every load switched off, which tells me whether the leakage is in the wiring or in an appliance. Then I switch off all the MCBs under the RCCB, reset it, and switch the MCBs on one at a time, waiting each time, until it trips; that identifies the circuit. On that circuit I unplug the appliances and do an insulation resistance test between conductors and earth, with loads and electronics disconnected. Night trips often point to a geyser element, an outdoor light or a damp junction box after rain. Bypassing or removing the RCCB to stop the trips is never acceptable.
33. An 11 kV / 433 V distribution transformer is rated 250 kVA. What are its turns ratio and its full-load currents on the HV and LV sides?
The line voltage ratio is 11,000 / 433 = about 25.4, but that is not the turns ratio. A distribution transformer like this is normally Dyn11, with the HV winding in delta and the LV winding in star. Each HV winding has 11,000 V across it and each LV winding 433 / 1.732 = 250 V, so the turns ratio is 11,000 / 250 = 44. Full-load current is VA divided by root 3 times the line voltage: 250,000 / (1.732 x 433) = about 333 A on the LV side and 250,000 / (1.732 x 11,000) = about 13.1 A on the HV side. These set the cable and breaker sizes, and an LV load near 320 A means the transformer is close to full load.
34. What routine checks do you do on an oil-filled distribution transformer?
I check the oil level in the conservator, look for oil leaks at gaskets and valves, and check the breather silica gel: the common blue type turns pink as it absorbs moisture, and then it is replaced or dried. I note the oil and winding temperature indicators and the load. I listen for unusual noise, and check the earth connections, the bushings for cracks or tracking, and the cable boxes. Periodically the oil is sampled and tested for breakdown voltage. The CEA's inspection forms list items such as insulation resistance, oil breakdown voltage, oil level and the temperature alarm and trip settings, so my records match them.
35. You need to tap an M10 thread in a mild steel plate. What drill size do you use, and how do you tap it without breaking the tap?
M10 coarse has a pitch of 1.5 mm, and the common workshop rule is tap drill = major diameter - pitch, so 10 - 1.5 = 8.5 mm. I centre punch, drill a pilot hole, then drill 8.5 mm square to the face and chamfer the edge. I start with the taper tap held square in the tap wrench, checking with a try square, and follow with the intermediate and plug taps. I use cutting oil and turn back about half a turn after every turn or so to break the chip. Forcing the tap, letting it go out of square or hitting the bottom of a blind hole are the usual causes of a broken tap.
36. A hole is 25.000 to 25.021 mm and its shaft is 24.980 to 24.993 mm. What type of fit is this, and what are the maximum and minimum clearances?
Maximum clearance is the largest hole minus the smallest shaft: 25.021 - 24.980 = 0.041 mm. Minimum clearance is the smallest hole minus the largest shaft: 25.000 - 24.993 = 0.007 mm. Both are positive, so the shaft always has some clearance: it is a clearance fit, suitable for a part that must slide or turn. If the smallest shaft were bigger than the largest hole, it would be an interference fit, and an overlap of the two ranges would make a transition fit. This is a hole basis example, with the hole starting at the basic size, which suits shops that make holes with standard drills and reamers.
37. A hydraulic cylinder has a 50 mm bore and works at 100 bar. What force does it push with, and why is the force lower when it retracts?
Force is pressure times area. The bore area is pi x 25 x 25 = about 1,963 sq mm. 100 bar is 10 N per sq mm, so the push force is 10 x 1,963 = about 19,600 N, or 19.6 kN, roughly 2 tonnes. On the return stroke the oil acts only on the ring-shaped area around the rod. With a 28 mm rod, the rod takes about 616 sq mm, leaving about 1,348 sq mm, so the pull is only about 13.5 kN. That is why the heavier work is normally done on the push stroke. Interviewers check the unit conversion here: 1 bar is 0.1 N per sq mm.
38. How do you replace the bearing on a motor or pump shaft? The old bearing is marked 6205.
I lock out the machine, mark the coupling and motor positions, and remove the motor. I pull the old bearing off with a puller seated on the inner ring, then clean the shaft and check it for wear or damage. In the standard numbering, the last two digits 05 times 5 give the bore, so a 6205 has a 25 mm bore; I match the full number, including any suffix for seals or clearance. I heat the new bearing with an induction heater, never an open flame, slide it on and let it cool, or press it on through the inner ring only. Hammering on the outer ring damages the balls and races.
39. A drawing shows a bore as 40 H7, with a perpendicularity symbol referring to datum A. What do these mean, and how do you check the bore on the shop floor?
H7 means the H position, whose lower limit is the basic size, with a grade 7 tolerance, which for 40 mm gives 40.000 to 40.025 mm. The perpendicularity frame means the bore's axis must stay within the stated small zone at right angles to face A, the datum. For size I use a GO plug gauge of 40.000 mm, which must enter the full depth, and a NO-GO of 40.025 mm, which must not enter; a dial bore gauge then shows ovality and taper at several depths. A vernier is useless here, since its 0.02 mm least count is most of the band. For perpendicularity I use a mandrel and dial indicator on a surface plate, or a CMM.
40. A pneumatic cylinder on a packing machine has become slow and weak. What do you check?
First the supply: the pressure at the FRL unit, which filters, regulates and lubricates the air, and whether the filter bowl is full of water or the element is choked. Then leaks: I listen, and use soap solution on fittings and hoses, especially where the machine has been modified. Next the flow control valves, which someone may have closed down, and the exhaust silencers, which clog with oil and dust. If the supply is fine, I check the valve for a sticking spool or a weak solenoid, and the cylinder for worn seals by pressurising one side and checking for air escaping from the other port. Then I record the cause.
Electrician and ITI Fitter interview questions: Hard questions (experienced)
20 questions41. A plant's load is 50 kW at a power factor of 0.7. How much capacitor kVAR do you need to raise it to 0.95, and what happens to the current at 400 V?
Required kVAR is kW x (tan of the old angle - tan of the new angle). The angle for 0.7 has a tangent of about 1.020 and the angle for 0.95 about 0.329, so 50 x (1.020 - 0.329) = about 34.6 kVAR; I would choose the next standard bank size, switched in steps. Apparent power falls from 50 / 0.7 = 71.4 kVA to 50 / 0.95 = 52.6 kVA, so the line current falls from about 103 A to about 76 A. Before adding capacitors I would check for harmonics from drives, which can cause resonance, and make sure steps switch out at light load to avoid a leading power factor.
42. You are the maintenance supervisor for a shutdown on a feeder. How do you run the permit-to-work so that nobody gets hurt?
Before work I list the hazards, such as back-feed from a generator or another feeder, induced voltage, work at height and fire, and brief the whole crew. I obtain the permit from the operation in-charge, who isolates the feeder from every source and confirms it. I then prove the line dead with a tested voltage detector and fix local earths at the work zone. The CEA's safety regulations set this order: permit, isolation and earthing, confirming the line is dead, and local earths staying on until all men and materials are clear and the permit is returned. I return the permit only after a head count, and only then is supply restored.
43. Your plant wants to add a new feeder and some sockets in a workshop. Under the CEA's safety regulations, who is allowed to do this work?
Additions and alterations must be done by an electrical contractor licensed by the State Government, under the direct supervision of a person holding a certificate of competency, and by a person holding a permit the State Government issued or recognises. Only simple replacements are exempt, such as lamps, fans, fuses, switches and domestic appliances up to 250 V that do not change the installation's capacity or character. Work done any other way must not be energised. A new installation is also self-certified by the owner before supply starts if it is at or below the voltage the state notifies, or inspected by the Electrical Inspector if above it. Licence names and exams differ by state.
44. Your factory's connected load has just crossed 250 kW. What changes under the CEA's safety regulations, and what would you set up?
The CEA (Measures relating to Safety and Electric Supply) Regulations, 2023, which replaced the 2010 regulations, require the owner of a factory with more than 250 kW connected load to designate an Electrical Safety Officer: an electrical engineering graduate with five years of operation and maintenance experience, or a diploma holder with ten. The officer carries out the recommended periodic tests, inspects the installation at intervals of not more than one year, and keeps test reports and a register of safety recommendations for the Electrical Inspector. As maintenance lead I would set up the test schedule, earth and insulation records, the list of designated persons and the permit system, so the yearly inspection finds evidence, not gaps.
45. A conveyor drive-end bearing has failed three times in four months. How do you find the root cause instead of replacing it again?
I stop treating it as a bearing problem and treat it as a failure to explain. I collect the facts: dates, running hours, how each failed bearing looked, the grease used and how often, and any change in load or belt tension. I inspect the removed bearings: discoloured races suggest overheating or over-greasing, a wear track on one side suggests misalignment or overload, fluting suggests current passing through the bearing, often from a drive, and pitting with dirt points to contamination. Then I check alignment, belt tension, shaft fit and seals. I use a five-why chain, fix the cause, and track the next bearing's temperature and vibration to prove the fix.
46. You are asked to build a preventive maintenance plan for a plant's motors and electrical panels. How would you structure it?
I start with an asset list ranked by criticality: which motors stop production or affect safety if they fail. For each class I set tasks and intervals from the maker's manual and our breakdown history: daily operator checks for noise, heat and vibration, monthly current readings and tightness checks, periodic insulation resistance tests, greasing by running hours, and thermal imaging of panels under load to catch loose or overloaded joints. Each task gets a checklist, an owner and a record. I review the plan every quarter against breakdowns and keep critical spares such as contactors and bearings. The plan is judged by fewer breakdowns, not by tasks ticked.
47. In a 720-hour month a machine broke down 6 times, with 18 hours of total downtime. Calculate MTTR, MTBF and availability, and say what you would do with these figures.
MTTR, mean time to repair, is downtime divided by breakdowns: 18 / 6 = 3 hours. MTBF, mean time between failures, is running time divided by breakdowns: (720 - 18) / 6 = 702 / 6 = 117 hours. Availability is running time divided by total time: 702 / 720 = 97.5 percent. Then I would split the six breakdowns by cause. A high MTTR points to spares, access or skills, so I would stock critical spares and train the crew. A low MTBF points to the equipment or the preventive maintenance. Some plants count only scheduled hours, so I check how the plant defines each figure before comparing.
48. A PLC-controlled machine stops in the middle of a cycle and shows no alarm. How do you find the fault?
First I ask the operator exactly what happened and at which step it stopped. Then I look at the PLC: is it in run mode, is any fault light on, and which input and output LEDs are lit. If the next step needs, say, a proximity sensor to confirm that a clamp has closed, I check that input LED; if it is off, I check the sensor, its distance from the target, its cable and its 24 V supply. With a laptop and the plant's software I go online and monitor the rung for that step to see which condition is false. I never force inputs or change the program without authorisation and a backup.
49. Explain a start-stop latching circuit in PLC ladder logic. Why is the stop button usually wired as a normally closed contact?
The rung has the start input as a normally open contact, in parallel with a contact of the motor output itself, which forms the latch, and in series with the stop input and the overload input, then the output coil. Pressing start turns the output on, and the output's own contact keeps it on after the button is released. The stop button is wired normally closed, so its input is on when healthy and the program checks that it is on. If the stop wire breaks, the input goes off and the motor stops: the failure is safe. An emergency stop must also cut power through hardwired safety relays, not only through the PLC.
50. The plant is replacing a star-delta starter on a 37 kW fan with a variable frequency drive. What benefits and risks would you explain, and what would you check?
The benefits are a soft start without the current surge and torque jerk of star-delta, and energy savings: fan power varies roughly with the cube of speed, so at 80 percent speed the fan needs only about half the power, instead of wasting it across a damper. The risks are harmonics on the supply, voltage spikes on the motor insulation with long cables, bearing currents, and less cooling for a self-cooled motor at low speed. I would check that the motor suits drive use, the cable length and screened cable, earthing and panel ventilation, set the parameters from the nameplate, and enable flying start so the drive can catch a fan that is already turning.
51. A transformer has been repaired after a fault. What tests would you want before you re-energise it?
I would want insulation resistance between HV and LV, HV to earth and LV to earth, and the oil's breakdown voltage on samples from the top and the bottom of the tank, because a repair can leave moisture or contamination. Winding resistance on every tap finds open circuits, loose joints and bad tap changer contacts. Ratio, polarity and vector group tests confirm the connections, followed by magnetic balance, tan delta, and checks of the oil level, breather, temperature indicators and their alarm and trip operation. The CEA's inspection forms cover most of these, including tan delta. I compare the results with the factory test report and earlier readings, then energise on no load first before taking load.
52. A centrifugal pump's mechanical seal starts leaking a few weeks after every replacement. How do you find out why?
Repeated seal failure is usually a symptom, so I look at how the pump is run and fitted, not just at the seal. I check whether it runs dry or against a closed valve, since a seal needs liquid at its faces, and whether the flush or cooling line to the seal is blocked. I inspect the failed seal: cracked or burnt faces point to dry running or heat, uneven wear to misalignment or a bent shaft, and scored faces to dirt in the liquid. Then I check shaft runout with a dial indicator, the bearings, coupling alignment and the seal setting length during fitting. The faces must be kept clean and never handled with bare fingers.
53. A short circuit on one machine tripped the main incomer breaker instead of the machine's own MCCB, and the whole shop stopped. What went wrong, and how do you prevent it?
That is a failure of discrimination, also called selectivity: the device closest to the fault should trip first while the upstream devices stay closed. Usually the incomer's short-circuit or instantaneous setting overlaps the downstream breaker's trip range, someone has changed the settings, or the downstream MCCB is not suitable for the fault level. I would collect the breaker data, compare their time-current curves, and get the settings coordinated, often by giving the incomer a short time delay while the feeder trips instantly. Then I test the releases and record the agreed settings on the panel. I would also find out why the machine had a short circuit at all.
54. A socket circuit is protected by a 32 A C-curve MCB, and you measure an earth fault loop impedance of 2 ohm at 230 V. Is this safe, and what do you do?
The fault current would be about 230 / 2 = 115 A. A C-curve MCB is only sure to trip instantly once the current reaches 10 times its rating, 320 A for a 32 A MCB, so 115 A falls in its slow thermal region and could take seconds or longer while a metal body stays live. For instant tripping the loop impedance should be no more than about 230 / 320 = 0.72 ohm. I would find and fix the high resistance in the earth path, such as loose terminals or a long thin earth wire, and make sure a 30 mA RCD covers the sockets. The CEA's safety regulations require loop impedance low enough for the protective device to operate in time.
55. A conveyor gearbox is running hot and getting noisier week by week. How do you investigate it before it fails?
First I collect data: housing temperature with an infrared thermometer, vibration readings if we have a meter, the load and running hours, and when it was last serviced. Then, with the drive locked out, I check the oil level and whether the grade matches the maker's recommendation, and drain a sample: metal particles or a milky colour point to gear or bearing wear or water entry. A choked breather can push oil past the seals. I check the couplings for misalignment, the mounting bolts, and the gear teeth through the inspection cover for pitting or uneven contact. If the trend is rising fast, I plan a shutdown and spares now instead of waiting for a breakdown.
56. How do you align a motor and pump coupling with dial indicators, and what is soft foot?
First I check for soft foot, a foot that does not sit flat: with the motor bolted down, I loosen one foot at a time with a dial indicator on it, and if the foot springs up beyond the tolerance in the alignment procedure, I correct it with shims, because tightening a rocking foot twists the frame. Then I mount dial indicators on one hub reading the rim and face of the other, turn both shafts together, and read at 0, 90, 180 and 270 degrees. Rim readings show offset and face readings show angular error. I correct vertical errors with shims and horizontal errors by moving the motor, then recheck.
57. A bearing with a 60 mm bore must be shrink-fitted on a shaft with 0.03 mm interference. Taking steel's expansion as 0.000012 per degree C, how much must you heat it to slide it on with 0.02 mm clearance?
The bore must grow by the interference plus the clearance: 0.03 + 0.02 = 0.05 mm. Expansion is coefficient x diameter x temperature rise, so the rise is 0.05 / (0.000012 x 60) = 0.05 / 0.00072 = about 69 degrees C. If the shaft is at 30 degrees C, I heat the bearing to about 100 degrees C with an induction heater and a temperature probe, staying below the bearing maker's maximum heating temperature. Then I slide it on quickly against the shoulder and hold it there while it cools, since it can creep away as it shrinks. Overheating can soften the steel or damage the seals and grease.
58. A hydraulic press is running hot and losing pressure during the pressing stroke. How do you approach it?
Heat and pressure loss together usually mean oil is passing somewhere without doing work. I first check the oil level, the cooler and the filter indicator, and take an oil sample if it looks dark or milky. Then I fit gauges at the pump outlet and at the cylinder and watch the pressure during the stroke. If the relief valve opens below its set pressure, it is set too low or its seat is worn. If pressure holds at the pump but drops at the cylinder, I suspect the directional valve, or internal leakage past the piston seals, checked by pressurising one side with the other port open. Dirty oil is behind many such failures.
59. Tell me about a major breakdown you handled at night with production waiting. How did you manage your crew and the people asking for updates?
A strong answer follows situation, task, action and result. For example: at 2 a.m. the cooling-water pump serving three lines stopped because its coupling element had broken up and sheared the key. My task was to restore cooling quickly and safely. One technician started the standby pump and locked out the failed one, while the second and I fitted a new element and key and checked alignment before restarting. I updated the shift in-charge every 30 minutes with facts and an estimate. Cooling was back in 90 minutes, and since the motor had been changed without an alignment check, I added one to that procedure. Interviewers look for safety under pressure, clear task allocation, honest updates and a permanent fix.
60. During calibration, a micrometer used on a production line is found to read 0.02 mm high. What do you do about it and about the parts already measured?
I tag the micrometer out of use at once and check the calibration record for when it was last found correct. Every part measured with it since then is suspect, so I identify those batches and, with quality, decide whether to re-measure them with a calibrated instrument, because parts close to the tolerance limit may actually be outside it. The instrument is then adjusted or replaced and recalibrated against gauge blocks traceable to national standards, often through an NABL-accredited laboratory. I also check why it drifted, such as a drop or wear, and whether its calibration interval should be shorter. The record matters as much as the fix.